Customer storyLucid Motors
How Lucid Motors Cut Packaging Engineering Time 70-85%
One year in. Zero regrets.
Lucid Motors' packaging team replaced three disconnected tools with one platform. Estimates that took 15 to 20 minutes now take 2 to 5 minutes, with packaging and freight cost built into every result.

- Less time per packaging estimate
- 70-85%
- CAD import to finished report
- 2-5 min
- Engineering hours saved per launch
- 250-600 h
- Labor cost savings per launch
- $17K-$42K
Throughout my career, the packaging software market has felt largely neglected.
Before and after
Three different tools, now all-in-one.
Before a vehicle launch, Lucid builds packaging concepts and cost models from CAD alone, for hundreds of parts, before sourcing begins.
| Step | Historical workflow | Pack Studio |
|---|---|---|
| Starting point | A complex, disconnected workflow | One unified platform |
| Input | Carton-level density study in one tool | Import part CAD directly |
| Layouts | Pallet and truck layouts in separate palletizing software | Select standards and design criteria once |
| Review | Stitch everything together in PowerPoint | Options generate in seconds, ranked by cost |
| Cost | Not available in either tool | One click to a report ready for any level of management |
| Time | 15 to 20 minutes per estimate | 2 to 5 minutes, start to report |
How it works
CAD into shareable packaging intelligence.
Pack Studio goes from CAD to box, pallet, container and truck in under 90 seconds, packaged into a shareable PDF.
Import
Bring in part CAD directly. No intermediate files, manual measurement or separate density studies.
Define
Apply packaging standards and design criteria once. They carry across every estimate.
Decide
Solution options generate in seconds, ranked by cost. Choose one and produce the report immediately.
The business case
Measured across a full vehicle launch.
Lucid runs 1,500 to 2,000 packaging estimates per launch, so minutes per estimate add up to a budget line.
| Measure | Result |
|---|---|
| Time per estimate, before | 15 to 20 minutes |
| Time per estimate, with Pack Studio | 2 to 5 minutes |
| Reduction in time per estimate | 70-85% |
| Estimates per launch | 1,500 to 2,000 |
| Engineering hours saved per launch | 250 to 600 hours |
| Labor cost savings per launch | $17K to $42K |
Calculator
Run the Lucid math on your launch.
Lucid's range comes from 1,500 to 2,000 estimates at 15 to 20 minutes before and 2 to 5 minutes after. Enter your own numbers.
Market differentiator
Cost data, built in.
Packaging and freight cost estimating is native to every result, and solutions are ranked by shipping cost.
| Capability | In Pack Studio |
|---|---|
| Carton density study | Native |
| Dunnage, pallet and truck | Native |
| Executive PDF report | One click |
| Packaging cost estimate | Built in |
| Freight cost estimate | Built in |
Built-in packaging and freight cost estimates I have yet to see offered by any other packaging software on the market.
FAQ
About this case study.
How much time did Lucid Motors save with Pack Studio?
Time per packaging estimate fell from 15 to 20 minutes to 2 to 5 minutes, a 70-85% reduction. Across 1,500 to 2,000 estimates per vehicle launch, that is 250 to 600 hours and $17K to $42K in labor per launch.
What did Pack Studio replace at Lucid Motors?
Three disconnected tools: a carton-level density study, separate palletizing software for pallet and truck layouts, and PowerPoint to stitch the results together. None of them estimated packaging or freight cost.
Unlock your competitive advantage.
See what a year of Pack Studio could return on your next launch.
Sources for the figures on this page
- One year in. Zero regrets. Lucid Motors one-year review of Pack Studio, Pack Studio, 2026-06-23. Reduction in time per packaging estimate: 70-85%; Time per packaging estimate, historical workflow: 15 to 20 minutes; Time per packaging estimate with Pack Studio, CAD import to finished report: 2 to 5 minutes; Engineering hours saved per vehicle launch: 250 to 600 hours; Labor cost savings per vehicle launch: $17K to $42K; Time from part CAD to box, pallet, container and truck layout: under 90 seconds; Packaging estimates per vehicle launch: 1,500 to 2,000.
Every figure resolves from the facts registry.