Answers /// Deciding

# How do I include packaging and logistics cost in an RFQ?

**Short answer:** Estimate packaging, pallet and freight cost per part from the part's CAD before you quote, then include it in the bid so suppliers are compared on landed cost. Tier 1 suppliers use Pack Studio to do this in request for quotation (RFQ) responses.

Updated November 19, 2026

## Piece price is not the price

A request for quotation (RFQ) usually compares suppliers on piece price. Packaging, freight, warehousing and quality costs land later, on other budgets. In one worked example from The Packaging Perspective Series, a supplier chosen for a 12-cent lower piece price turned a projected $42,000 annual saving into a $791,000 loss[^1] once the hidden costs were counted.

## For suppliers responding to an RFQ

1. Load the part CAD the buyer supplied.
2. Run the containers the buyer specifies, or propose better ones.
3. Include packaging, pallet and freight cost per part in the bid, with the [one-page report](https://www.pack-studio.com/features/pack-reports) attached.

A bid that shows its landed cost is easier to defend than one that shows only a piece price.

## For buyers issuing an RFQ

1. Estimate the packaging and freight cost of each part before bids arrive.
2. Use it to validate supplier-proposed packaging before committing to tooling.
3. Compare bids on [landed cost per part](https://www.pack-studio.com/features/cost-per-part-and-roi).

## Who already works this way

[Automotive Logistics](https://www.automotivelogistics.media/packaging/pack-studio-a-new-packaging-design-platform-drives-packaging-cost-analysis-upstream-into-logistics-planning/2704118) reported that Tier 1 suppliers use Pack Studio to include packaging and logistics costs in RFQ responses, and that buyers use it to validate supplier-proposed packaging before committing to tooling.

## The numbers behind this answer

- **Sourcing decision for one automotive part (worked example):** a $791,000 loss[^1], Net annual result of choosing the lowest piece price. Supplier chosen for a piece price 12 cents lower, projected to save $42,000 per year; hidden costs of $0.80 logistics, $0.42 packaging, $0.08 warehousing and $1.08 scrap and quality per part

## The features behind this answer

- [Cost Per Part and ROI](https://www.pack-studio.com/features/cost-per-part-and-roi): Pack Studio reduces every packaging option to one figure: box, protective packaging, pallet and freight divided across the parts on board.
- [Pack Reports](https://www.pack-studio.com/features/pack-reports): Every Pack Studio analysis ends in a one-page PDF covering the part, box, pallet, truck, protective packaging and full cost.
- [Truckload Optimization](https://www.pack-studio.com/features/truckload-optimization): Pack Studio loads pallets into trucks and shipping containers, such as a 53 ft dry van, and shows parts per truck and whether the load is limited by cube or by weight.

## Keep reading

- [Is packaging optimization software worth the investment?](https://www.pack-studio.com/answers/is-packaging-optimization-software-worth-it)
- [How do packaging engineers go from part CAD to a shippable pack without switching tools?](https://www.pack-studio.com/answers/from-cad-to-shippable-pack)
- [Packaging Optimization Software: The Complete Guide](https://www.pack-studio.com/post/industrial-packaging-optimization-software)
- [All answers](https://www.pack-studio.com/answers)

[^1]: Net annual result of choosing the lowest piece price: a $791,000 loss. One part, with about 400 more to review in the same program. Source: [The Packaging Perspective Series: Landed Cost](https://www.pack-studio.com/post/landed-cost-packaging-perspective-series-by-scott-huddas), 2025-12-17.